Flowers Construction Company

P.O. Box 1207
Hillsboro, TX  76645
Phone:(254) 582-2501
 
Other InfrastruX Service
Providers
B&H Maintenance & Construction
Chapman Construction Company
Flowers Construction Company
Gill Electric Service, Ltd.
Hawkeye, LLC.
InterCon Construction
Lineal Industries
Skibeck Pipeline Company
Texas Electric Utility Construction
Trafford Corporation
UtilX Corporation
 
Flowers Brochure PDF(578K)
For nearly 45 years, Flowers Construction Company has been dedicated to building distribution systems for utilities in the south-central United States. One of the most sought-after utility construction contractors in the region, the company specializes in underground and overhead installation, maintenance, and repair for both gas and electric distribution systems.
Electric: overhead and underground power line construction, installation, maintenance, and repair — from substation getaways to meter installation; overhead reconductoring; underground cable change outs; and other specialty services for new and existing distribution infrastructures.
Gas: main line and service line installation, maintenance, and repair; cathodic protection; vacuum excavation; and other specialty services for new and existing infrastructures.
Telecommunications: installation of telephone and cable television lines.

Sample Projects

  • Texas Motor Speedway: Installed entire electric infrastructure, including four miles of 2EG duct bank, 11 switch gears, 13 three-phase transformers, and pull boxes. For preferred and emergency power, provided 1000MCM aluminum 25KV URD primary cable feeders from airport electrical facilities and a substation in Roanoke, Texas.
  • Dallas-Fort Worth Airport: Replaced all electrical circuits, including pulling the 1000MCM aluminum cable in the duct system (located 15' to 28' below grade), installing over 5.5 miles of three-phase cable, and making more than 400 cable terminations and splices.
  • Baylor University: Moved two three-phase electric circuits and four sets of phone, communication, and cable TV lines underground by installing a conduit duct system, including four 6" conduits and eight 4" conduits, several directional bores, and installations of manholes, pull boxes, and switch gears; installed two 1000MCM 15KV circuits and wrecked out the overhead lines.
  • Round Rock, Texas: Upgraded the distribution lines from 7.2KV to 14.4KV, including change out of over 800 overhead and 200 underground transformers; built a temporary three-phase double circuit line around the substation to provide emergency power in case a transformer was lost during construction.




For more information about InfrastruX companies and services, please contact us at (206) 494-4010 or info@infrastrux.com.